Thursday, January 29, 2004
Barry:
1. What brand/model are the Garage door openers?
2. How many HP is the motor?
3. How many remotes are supplied?
4. Do they have remote keypads on the outside of the garage door?
5. What is the make and model of the security/intercom system?
6. Can it be remotely monitored? and by what Companies?
1. What brand/model are the Garage door openers?
2. How many HP is the motor?
3. How many remotes are supplied?
4. Do they have remote keypads on the outside of the garage door?
5. What is the make and model of the security/intercom system?
6. Can it be remotely monitored? and by what Companies?
Barry: House documentation and drawings. We would like to have the following documentation on the house:
1. Survey
2. Blueprints which accurately reflect the consturction of the house or notations made on the current set of plans we have.
3. Diagram of the septic system
4. Diagram of the Sprinkler system
4. Diagram of the phone, tv, and network wiring in the house, showing rooms involved and entry points into the house.
1. Survey
2. Blueprints which accurately reflect the consturction of the house or notations made on the current set of plans we have.
3. Diagram of the septic system
4. Diagram of the Sprinkler system
4. Diagram of the phone, tv, and network wiring in the house, showing rooms involved and entry points into the house.
Barry: Things look like they are moving along nicely on 303P. However I am concerned about:
1. The location of the vent hood in relation to the burners on the stove. Our current stove has all 4 burners under the hood and I believe that should be a requirement. We are going to look at some other model homes for a comparison. Your comment about "frying on the back burners" seems totaly wrong.
2. Alignment of Light Switch Panels with the Security System in the Jack and Jill Bedrooms and other rooms should line up.
3. The need for more expansion joints or sawing to give the drive way "structured" places to crack.
Can you give me an estimate on when I should target our inspector for looking over the property?
1. The location of the vent hood in relation to the burners on the stove. Our current stove has all 4 burners under the hood and I believe that should be a requirement. We are going to look at some other model homes for a comparison. Your comment about "frying on the back burners" seems totaly wrong.
2. Alignment of Light Switch Panels with the Security System in the Jack and Jill Bedrooms and other rooms should line up.
3. The need for more expansion joints or sawing to give the drive way "structured" places to crack.
Can you give me an estimate on when I should target our inspector for looking over the property?
Barry: Can you provide:
1. a 'heads up list" indicating the major items to be completed and the planned start/stop dates?
2. When can we review the planned landscape/irrigation plan?
3. When can we review the planned eve spout locations and drainage map?
1. a 'heads up list" indicating the major items to be completed and the planned start/stop dates?
2. When can we review the planned landscape/irrigation plan?
3. When can we review the planned eve spout locations and drainage map?
Wednesday, January 28, 2004
Sounds like you are making progress. We believe quality and correctness are more important than time. We are going to come out tomorrow afternoon.
I get an email when new posts are made. I am researching to see you you and Marilyn can also get an email.
But for now just scan. and I think if would be best to post any answers as a seperate post rather than edit an existing post. That way the newest stuff will be at the top of the blog.
But for now just scan. and I think if would be best to post any answers as a seperate post rather than edit an existing post. That way the newest stuff will be at the top of the blog.
Tuesday, January 27, 2004
Barry:
I assume that on or before closing we will receive a wiring diagram(s) for TV, Phone, and Network showing what is wired where?????
Burt,
I don't have a physical diagram of the wiring. However, the communications box in your master closet will have a diagram on the panel which shows all of the rooms and where the wires are going - both for cable and phones. When you add satelite TV or whatever entertainment provider type you choose, they can edit or ammend the chart on the panel. Is that sufficient?
Barry, just want to make sure I know where all of the wires go to and from. I will have to look at diagram in master closet.
I assume that on or before closing we will receive a wiring diagram(s) for TV, Phone, and Network showing what is wired where?????
Burt,
I don't have a physical diagram of the wiring. However, the communications box in your master closet will have a diagram on the panel which shows all of the rooms and where the wires are going - both for cable and phones. When you add satelite TV or whatever entertainment provider type you choose, they can edit or ammend the chart on the panel. Is that sufficient?
Barry, just want to make sure I know where all of the wires go to and from. I will have to look at diagram in master closet.
Information on Blogs and Business can be found at: http://www.computerworld.com/softwaretopics/software/story/0,10801,89283,00.html
This is the inital post to the Blog to track the status fo 303 Partridge, document construction progress, and keep track of information in a chronological format.